Hutchinson is a French factory that produces low pressure rubber hoses located in Ruma. Based on their requests, a central system for monitoring and controlling the ventilation of 4 autoclaves, 2 air chambers for production halls, a thermal substation was realized, and hot water was prepared for the production plant. There is also an integrated system for monitoring electricity consumption as well as monitoring electrical cabinets.

 

Đani-Bardoti-Industriska-zona-HutchinsonRuma.jpg

Hutchinson_4.jpg

Hutchinson_3.jpg

 

Delta Transport System (DTS) is a company specializing in providing logistics services. It has 20,730 square meters of warehouse space, with a center capacity of 26,000 pallet spaces across various temperature regimes ranging from -20°C to +25°C.

The BMS integrates the following subsystems:

  • 4 air handling units and ventilation
  • Fan coil management by sector
  • Evaporator, humidifier, air cooler, and roof fan systems for different chambers (milk and cheese, fruits and vegetables, chocolate, and deep-freeze chambers). The BMS monitors all critical parameters in the chambers, which are logged to ensure the quality of stored products.
  • Substations for the distribution of hot and cold water with chillers and gas boilers.

   dts.jpg

 

Xingyu Automotive Lighting Systems, a leading Chinese company in the design and production of LED lighting for the automotive industry, has built its production and business complex in the industrial zone in Niš. The complex spans 47,000 m2 and has been constructed according to the highest quality standards. Ion Solutions contributed by integrating the following systems:

  • Monitoring and control of climate chambers designed for ventilation, heating/cooling of the production facility and administrative building with a kitchen.
  • Substations for the production and distribution of cold and hot water for manufacturing purposes.
  • Management of kitchen ventilation.

 Xingyu_Niš_-_hala.png

xingyulighting.jpg

 

Until recently, the largest unregulated landfill in Europe located in Vinča has undergone a transformation. The new facility has started to incinerate waste, transforming it into energy instead of just accumulating waste as has been done for decades.

To ensure the efficiency of the municipal waste incineration plant and to save energy during its operation, ION Solutions has implemented:

  • Monitoring and control of climate chambers
  • Monitoring and regulation of temperatures within the facilities
  • Monitoring and control of the heating plant
  • Monitoring and control of fans in technical rooms
  • Monitoring the status of cabinet power supply
  • Integration with KNX lighting.

 

26-LTP.jpg

1709904757-b1906b17315069e5d2f9c13d9f7b157e_2777439712-1024x683.jpg

 

 

 

CTP Šimanovci is a production and warehouse facility with administrative and technical sections, offering a total net area of 36,717.26 m2 for warehouse lease.

The implemented BMS enables monitoring and control of:

  • Thermal substation and gas boilers

  • Cooling substation and chillers

  • Five climate chambers for ventilation and space conditioning

  • Calorimeters

  • Compressor station

  • Sanitary facilities ventilators

  • Lighting in the administrative section

  • Fan coil units in the administrative building.

 

CTPark-Belgrade-North-2-2.jpg

 

 

The factory of the Austrian company Palfinger, partially completed in the "East" industrial zone in Niš, has begun the production of parts for cranes and lifting equipment. The factory is expected to be fully completed by the end of 2027.

Ion Solutions participated in the project by implementing a BMS (Building Management System) that monitors and controls:

  • 4 air handling units

  • 4 heat pumps

  • VRF units

  • Lighting

  • Pump station

  • Atmospheric water pumps

  • Compressed air system

  • Diesel generator

  • Transformer station

  • Electrical energy consumption.

  pogon-palfinger.jpg

PALFINGER_Loader_Cranes_PK48002_TEC7_.jpg

 

 

 

 

 

The Monus tobacco factory in Inđija is one of the largest and most modern tobacco factories in Southeast Europe. It spans over 22,000 square meters, with 13,010 square meters dedicated to production processes and 7,236 square meters for storage and tobacco shops.

To ensure minimal costs and savings, the entire complex is automated. The implemented system includes monitoring and control of:

  • 11 climate chambers for ventilation and air conditioning of production halls and storage areas
  • Heating plant for preparation and distribution of hot/cold water
  • Two chillers for preparation of cold water
  • Ventilation in laboratories, offices, warehouses, and toilets
  • Monitoring the status of electrical motor control cabinets and BMS.

 

s1.jpg

 

Wacker Neuson factory in Kragujevac specializes in manufacturing steel components for excavators, dumpers, wheel loaders, and telescopic loaders.

To optimize costs and savings, ION Solutions implemented a BMS that enables:

  • Monitoring electricity consumption, gas meters, and water meters
  • Supervision and control of roof domes in the production hall
  • Elevator status monitoring
  • Substation monitoring
  • Lighting control in the production hall.

 