The General Hospital in Loznica occupies an area of 5,000 square meters of a health institution consisting of 4 levels.

During the reconstruction of this facility, a BMS system was installed, which includes the management of:

  • with 9 air chambers via modbus communication
  • with hot and cold water substation
  • with local exhaust fans.

In addition to managing these systems, the following is also performed:

  • regulation of air quality by VAV valves based on temperature and humidity in the room
  • maintenance of overpressure in operating rooms via VAV valves based on differential pressure sensor in the room
  • monitoring of contamination of "H" filters in operating rooms
  • supervision of openness and closure of all PP valves in the building
  • chiller control.