
Schneider Electric equipment, ie the central monitoring and control system CSNU (SCADA) was implemented at the general hospital in Vranje for all subsystems belonging to the BMS project, which were implemented on the SmartX Controller As-P with the necessary modules. The subsystems that have been implemented include ventilation and air conditioning of the building using a system of air conditioning chambers, a thermal substation system for the production and distribution of hot/cold water in the building. Also included is the supervision of the subsystems for the operating room, monitoring of the condition of medical gases and monitoring of the condition of diesel generators.