fbpx

 

 

 

The Clinic for Gynecology and Obstetrics of the Clinical Center of Serbia is the reference and largest institution of this type in the country. In order for employees to have easier access and management of all subsystems, SchneiderElectric equipment, ie a central system for supervision and management, has been implemented CSNU (SCADA) which implies the existence of a central unit, ie. server on which it is possible to monitor and manage all subsystems belonging to the BMS project that are implemented on the SmartX Controller As-P with the necessary modules. Monitoring of the status of fuses in distribution cabinets on the floors from the ground floor to the technical floor, monitoring of network analyzers (PM5100 i PM710), supervision of operating room subsystems, medical gases, bactericidal lamps and insulation controllers. For easier access and reading of the system, a #HMI panel has been installed, with the help of which employees operate chillers that provide cold water for the air conditioning chamber and air conditioning chambers for intensive care.

 

Picture2-1024x680.jpg