In the heart of Belgrade's business district, at the site of the former "Tri lista duvana" tavern, stands a newly constructed commercial building with fully equipped office spaces for rent.

The building has 9 floors with approximately 8,300 square meters of usable space, where a BMS (Building Management System) has been implemented to manage:

  • the heat substation,
  • the cooling substation,
  • 4 air handling units,
  • fan coils, and to monitor the energy consumption of the tenants' spaces.

 

tri-lista-duvana-ulaz.jpg

 0705c6b186a816790b4d1ac1623f50df.jpg

 

In New Belgrade, Block 65, the investor Exing B&P has built a new modern office building, TB65. This contemporary office facility consists of two sections.

In both sections, ION Solutions has implemented a BMS that manages:

  • Air handling units - for the air conditioning and ventilation of office spaces
  • Thermal substation - for the production and distribution of hot water
  • Fan coil units
  • and performs:
  • Monitoring of fire system status
  • Monitoring of diesel generator status.

 

tb65-01.jpg

 

In the administrative building of Elektromreže Srbije a.d. in Belgrade, ION Solutions has implemented a BMS (Building Management System) that manages:

  • 2 air handling units
  • the heating substation
  • indoor lighting
  • heating and cooling via fan coil units.

 