fbpx

 

 

 

The construction of the Imel Group’s business building and headquartes in Belgrade, which is situated on 3.500 square meters, required installation of the system that integrates all subsystems in the facility (control of lighting, air conditioning, access, lifts, audio system, fi re protection system, etc.) into the central surveillance and management system.

By doing so, it is possible to manage the entire building, which enables saving a great amount of energy. This facility can be classified as «green» as it is a notable example of the rational use of energy.